Au, T and Hendrickson, C (1986) Profit Measures for Construction Projects. Journal of Construction Engineering and Management, 112(02), 273–86.

Haltenhoff, C E (1986) Educating Professional Construction Managers. Journal of Construction Engineering and Management, 112(02), 153–62.

Handa, V K and Barcia, R M (1986) Construction Production Planning. Journal of Construction Engineering and Management, 112(02), 163–77.

Hinze, J and Hinze, M M (1986) Problems Associated with Removal of Asbestos. Journal of Construction Engineering and Management, 112(02), 211–9.

Koehn, E and Brown, G (1986) International Labor Productivity Factors. Journal of Construction Engineering and Management, 112(02), 299–302.

Lemna, G J, Borcherding, J D and Tucker, R L (1986) Productive Foremen in Industrial Construction. Journal of Construction Engineering and Management, 112(02), 192–210.

Liu, X, Chen, W and Bowman, M D (1986) Shore‐Slab Interaction in Concrete Buildings. Journal of Construction Engineering and Management, 112(02), 227–44.

Royer, K (1986) The Federal Government and the Critical Path. Journal of Construction Engineering and Management, 112(02), 220–5.

  • Type: Journal Article
  • Keywords: Construction management; Contract management; Critical path method; Delay time; Federal project policy;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(1986)112:2(220)
  • Abstract:
    The critical path method has been increasingly used as an administrative and legal tool rather than as a planning instrument. The writer claims that this evolution has made its planning function of little use to the contractor, using the contract clause of the Federal Government regarding the method of determining allowable contract delay as an illustration. It is asserted that this clause greatly increases the contractors' responsibilities for planning, at the expense of efficient construction management.

Tatum, C B (1986) Designing Project Organizations: An Expanded Process. Journal of Construction Engineering and Management, 112(02), 259–72.

Tatum, C B (1986) Potential Mechanisms for Construction Innovation. Journal of Construction Engineering and Management, 112(02), 178–91.

Thomas, H R, Mathews, C T and Ward, J G (1986) Learning Curve Models of Construction Productivity. Journal of Construction Engineering and Management, 112(02), 245–58.

Vombatkere, S G (1986) Bridge Resting on an Ice Body at High Altitude. Journal of Construction Engineering and Management, 112(02), 287–96.